Nevada Organic Phosphate Inc. (CSE: NOP; OTCQB: NOPFF) reported that heavy metal assays from the Upper Phosphatic Zone at its Murdock Mountain project remain well below the maximum limits generally used for organic fertilizer certification. The company announced that weighted average concentrations for arsenic, cadmium, mercury, lead and other regulated metals were significantly below the thresholds established under AAPFCO's SUIP #25 guidelines and California standards. Drill hole MM26-9 returned an intersection grading 10.73% P₂O₅ over 4.50 meters of drilled thickness, highlighting continued consistency in phosphate grades.
The results reinforce the consistency of phosphate grades, thicknesses and low contaminant levels across the Upper Phosphatic Zone as the company advances exploration at Murdock Mountain. Nevada Organic Phosphate added that the assay work was completed by ALS Laboratories under ISO/IEC 17025:2017 accreditation. Company quality assurance and quality control procedures, including the use of blanks and certified reference materials, support the reliability of the reported analytical results.
Nevada Organic Phosphate is a junior exploration company with an organic sedimentary raw rock phosphate bed, 6.6 kilometres long, in northeast Nevada. Additional applications extend the potential strike of rock phosphate to over 30 kilometres. This is believed to be the only known large-scale organic sedimentary phosphate project in North America. It is situated close to the main highway to Montello/Elko, Nevada, and near the rail head to California.
For more information, visit the company's newsroom at https://ibn.fm/NOP. To view the full press release, visit https://ibn.fm/l73AJ.


