LaFleur Minerals Inc. (CSE: LFLR) (OTCQB: LFLRF) (FSE: 3WK0) has reported assay results from its fall 2026 drilling program at the Swanson Gold Deposit, revealing near-surface gold mineralization that extends the deposit approximately 90 meters west along strike from the planned starter pit. The results, announced by LaFleur Minerals (CSE: LFLR) (OTCQB: LFLRF) (FSE: 3WK0), highlight the potential to expand the starter pit westward, which could enhance the project's economics.
Drill hole SW-26-126 intersected 2.52 grams per metric ton (g/t) gold over 14.35 meters, including 9.40 g/t over 1.7 meters and 5.37 g/t over 2.5 meters. A second hole, SW-26-125, returned 0.86 g/t gold over 45 meters, including 2.00 g/t over 7.5 meters and 2.08 g/t over 4.15 meters. These shallow, high-grade intercepts suggest that mineralization continues beyond the currently planned pit shell, which could lead to a larger and more robust mining operation.
The Swanson Deposit drilling campaign comprises 26 planned holes totaling approximately 12,300 meters within LaFleur's broader 93-hole, 25,570.5-meter exploration program at the Swanson Gold Project. To date, 15 holes totaling 6,756 meters have been completed in the deposit area, with assay results available for the first five holes. Ongoing drilling will investigate mineralization along strike, down-dip and down-plunge to evaluate the deposit's continuity and potential resource expansion. The company aims to establish a larger mineralized inventory to support future development of the Swanson Gold Project and planned utilization of its Beacon Gold Mill.
The implications of these results are significant for LaFleur Minerals as it advances the Swanson Gold Project, which is located in the Abitibi Gold Belt near Val-d'Or, Quebec, one of the world's most prolific gold-producing regions. The project is approximately 20,642 hectares and includes several prospects rich in gold and critical metals. The company recently released a positive Preliminary Economic Assessment for the project and the planned restart of the Beacon Gold Mill (refer to press release dated March 3, 2026). The Beacon Gold Mill is capable of processing over 750 tonnes per day and is being considered for processing mineralized material from Swanson and for custom milling operations for other nearby gold projects.
Investors can stay updated on LaFleur Minerals through its newsroom at http://ibn.fm/LFLRF. The full press release is available at https://ibn.fm/FvwYU. The announcement was disseminated through IBN, a communications platform that provides editorial syndication to 5,000+ outlets and social media distribution, among other services. For more details, refer to the https://RocksAndStocks.news/Disclaimer.


