Eloro Resources Ltd. (TSX.V: ELO) (OTCQX: ELRRF) (FSE: P2QM) has released assay results from the final two drill holes of its second phase definition program at the Iska Iska Project in southern Bolivia. The results confirm expanded higher-grade zones within both the Tin and Silver-Polymetallic domains in the Santa Barbara starter pit area. The completed phase totaled 8,286.40 meters across sixteen holes, all of which intersected significant mineralization in areas previously modeled as waste. Management noted that the results demonstrate a larger endowment of higher-grade silver-tin-polymetallic mineralization that is expected to upgrade and expand the Mineral Resource Estimate for the planned Preliminary Economic Assessment (PEA).
The Iska Iska project, located in the Potosi Department, is classified as a polymetallic epithermal-porphyry complex and is considered a significant mineral deposit type. The company has an option to acquire a 100% interest in the property, which is road-accessible and royalty-free. A recent NI 43-101 technical report on Iska Iska, completed by Micon International Limited, is available on Eloro’s website and under its filings on SEDAR. For more information about the company, visit www.EloroResources.com.
InvestorWire, a specialized communications platform, distributed this news. InvestorWire is part of the Dynamic Brand Portfolio @ IBN that delivers access to a vast network of wire solutions, article and editorial syndication to 5,000+ outlets, enhanced press release enhancement, social media distribution, and tailored corporate communications solutions. For more information, visit https://www.InvestorWire.com. The latest news and updates relating to ELRRF are available in the company’s newsroom at https://ibn.fm/ELRRF.


